Asphalt Batching Plant Request a Quote
|
Asphalt batching plant mainly including burning system, drying drum, dust collecting system, mixing system, bitumen supply system, accurate measuring system, electric control system, asphalt storage system. Dust collecting system: water dust or bag dust type. Burning system: oil burner, gas burner or coal burner type. Twin shaft mixer: Siemens motor. Output: 40-400 TPH.
The Scopes
Technical Parameters of Asphalt Batching Plant
Model |
Capacity (Standard Conditions) |
Mixer Capacity |
Dust Remove Effect |
Total Power |
Fuel Consumption |
Measurement Accuracy |
Fuel Oil |
Fuel Coal |
LB500 |
40t/h |
500 kg |
≤20 mg/Nm³ |
147kW |
5.5-7 kg/t |
10kg/t |
Aggregate: ±0.5% Filler: ±0.5% Bitumen: ±0.25% |
LB800 |
64t/h |
800 kg |
≤20 mg/Nm³ |
199kW |
5.5-7 kg/t |
10kg/t |
LB1000 |
80t/h |
1000 kg |
≤20 mg/Nm³ |
285kW |
5.5-7 kg/t |
10kg/t |
LB1200 |
100t/h |
1200 kg |
≤20 mg/Nm³ |
316kW |
5.5-7 kg/t |
10kg/t |
LB1500 |
120t/h |
1500 kg |
≤20 mg/Nm³ |
380kW |
5.5-7 kg/t |
10kg/t |
LB2000 |
160t/h |
2000 kg |
≤20 mg/Nm³ |
470kW |
5.5-7 kg/t |
10kg/t |
LB2500 |
200t/h |
2500 kg |
≤20 mg/Nm³ |
547kW |
5.5-7 kg/t |
10kg/t |
LB3000 |
240t/h |
3000 kg |
≤20 mg/Nm³ |
700kW |
5.5-7 kg/t |
10kg/t |
LB4000 |
300t/h |
4000 kg |
≤20 mg/Nm³ |
870kW |
5.5-7 kg/t |
10kg/t |
LB5000 |
400t/h |
5000 kg |
≤20 mg/Nm³ |
960kW |
5.5-7 kg/t |
10kg/t |
Main Structure of Asphalt Batching Plant

Vibrating screen system |
Weighing system |
Dust catcher system |
Belt conveyer |
 |
 |
 |
 |
Electrical control system |
Burning system |
Aggregate supply system |
Drying drum |
 |
 |
 |
 |
Project Case:
China: Henan, Hubei, Hunan, Hebei, Jiangsu, Anhui, Shandong, Shanxi, Shaanxi, Liaoning, Gansu, Qinghai, Ningxia, Sichuan, Jiangxi, Zhejiang, Jilin, Heilongjiang, Xinjiang……
Over Sea: Algeria, Libya, Philippines, Zimbabwe, Peru, Chile, India, Kazakhstan, Mongolia, Afghanistan, Israel, Poland……
Enquiry Form
[Form enquiry not found!]
|